Answers to common questions about cargo damage surveys, project cargo, port attendance, evidence and reporting in Morocco.
Timing depends on the location, cargo, port access, vessel schedule and current availability. For urgent matters, send the instruction, exact location, local contact, photos and available documents as early as possible.
Include the port or cargo location, cargo description, quantity, survey objective, required attendance time, local contact details, incident summary and any available photographs or transport documents.
Yes, depending on location and assignment scope. Surveys may be arranged at warehouses, delivery points or project sites as well as ports.
A marine cargo survey may cover condition and handling at loading, discharge, delivery or out-turn. A cargo damage survey focuses specifically on affected cargo, the nature and extent of damage, evidence, probable cause indicators and mitigation.
The surveyor documents condition, evidence and professional observations. Liability, policy coverage and legal responsibility are determined by the relevant insurers, contractual parties and legal advisers.
Yes. Dedicated services cover project cargo condition, loading/discharge attendance, lashing and securing, and route/road survey support.
Attendance may be coordinated at major ports including Casablanca, Tanger Med, Jorf Lasfar, Agadir and Nador, as well as other locations subject to access, timing and scope.
The bill of lading, packing list, delivery documents, tally records, pre-shipment photos, incident reports and any correspondence showing when the damage was discovered are commonly useful.
Joint attendance may be considered where required by the instruction and practical arrangements. The report will record the attendance and factual observations within the agreed scope.
Use the contact form, email or WhatsApp. Send the location, cargo, survey type, date/time required and any available supporting information so the assignment can be scoped properly.
Send the location, cargo, scope and required timing. We will review the instruction and respond with the next steps.